Safety Practices For Piling Machine

- Jun 19, 2017 -

First, the Piling Machine operators, must be familiar with the mechanical structure, performance, operating essentials and safety precautions, after passing the test and obtain a certificate, before the separate operation.

Second, the operator in the operation, we must focus on energy. Not with unrelated personnel that laugh, play, trouble, operation are not allowed to smoke and eat food.

Third, strict compliance with the provisions of the piling machine maintenance, do a good job at all levels of maintenance, to ensure that the piling machine is often in good condition. And pay attention to reasonable use, the correct operation.

Fourth, the piling machine before work, should make the following preparations:

1, to the construction staff to understand the construction conditions and tasks, and construction problems found in this class should pay attention to matters.

2, according to the construction workers required by the shock force, adjust the Piling Machine gear position.

3, check the cable, wire insulation is good. Check the controller contact is good, the boundaries are correct.

4, check the power supply voltage is to meet the requirements.

5, according to the daily maintenance of the Ministry of the Ministry of lubrication, maintenance.

5, piling machine in the work of the safety precautions:

1, piling machine work, there must be someone command. Commanders and operators should check each other before working with each other. Work should be closely with.

2, the beginning, the application of bells or other means to send a signal to inform the surrounding staff to leave.

3, Piling Machine and pile cap, pile cap and pipe column (or pile) plane to cushion, the connection bolt should be tightened, and should always check whether there is loose.

4, the piling machine should be started by the low speed file to speed up to high speed.

5, Piling Machine in the work should be closely watched on the control panel current, voltage instructions. If abnormal sound or other abnormal circumstances, should immediately stop inspection.

6, often check the bearing temperature and the bearing cap screws are loose phenomenon, to strictly check the eccentric iron connection screw loosening, to prevent accidents.

7, sink, the column (or pile) around the station is strictly prohibited.

8, piling machine with water, suction sedimentation, should be in contact with the relevant personnel, and in the work of mutual care.

9, the length of the string or pile and the installation of pile cap, the staff must wear seat belts.

10, sinking process, is strictly prohibited mechanical maintenance, maintenance work.

6, piling machine to stop working, should immediately cut off the power supply, and piling machines and motors to check, maintenance.

7, piling machine long-term disabled, should be stored in the storage, the motor to do a good job of moisture protection, control the instrument on the disk, should be removed packing custody.