Contact Us

Shandong Huaxia Group Co.,Ltd

Company Address: Huaxia Road, Weihai, Shandong Province

Tel:0086-0631-5991999

Fax:0086-0631-5999076

Mobile phone:13573745628

Zip Code:264205

Manger:Frankchao

Email:whdaisuo@hotmail.com

Reconsider The Classification Of Bucket Hoist Loading

- Jun 30, 2017 -

Bucket hoist is a widely used in grain storage, grain and oil and feed processing in the transmission equipment. The base is mainly composed of shell, feeding hopper, tail wheel, tensioning device, cleaning device and other parts.

Cleaning device to meet the following requirements: open and close convenience and good sealing. Equipment manufacturers, the general use of the board, through the card in the chute in and out to control the opening and closing of the cleaning gate. The chute structure is simple, easy to make, easy to use, to achieve the general sealing requirements. But for the transmission capacity of more than 50 t / h of the hoist, the use of failure, due to the storage of more seats, or because of scattered grain into the chute, resulting in difficult to pull out the board, coupled with the operator often beat the board, The board is easy to deform, increasing the difficulty of the extraction of the card.

 Combined with multi-party views, the cleaning device part of the improved. The improved cleaning device is mainly composed of cleaning material, quick clamping and detachable shaft. The bucket Hoist device has the following characteristics:

(1) the use of fast clips and removable shaft, can reduce the cleaning card opening and closing time, to solve the original card stuck problem, the operation more convenient J Jie Jie.

(2) After removing the shaft, you can remove the cleaning board, will not affect the clean material space.

 There are two kinds of bucket Hoist loading: that is, dig and inflow. D type and HL type are used to extract the type. In fact, strictly speaking, this type of dig is only a combination of style and dig style. The material is at 450 or 60 with the level. The angle of the way higher than the hoist base 1.2 to 1.4m height into the hoist, 60% to 70% by a, b hopper away, only 30% to 40% of the material to reach the hopper, especially the D Hoist, the situation is more obvious. Therefore, it is only a combination of style and dig-type loading method. It can be seen, the bucket Hoist loading method should be divided into three (1) digging style; (2) inflow type; (3) inflow.

The task of the bucket Hoist is to raise the material of point A to point B. Depending on how it works, it must have an inefficient lifting height for the loading process and the discharge process. In ensuring the safe and reliable operation of equipment under the premise of reducing its inefficient lifting height, to save civil construction, equipment investment and reduce operating costs, easy maintenance are important. The following describes a way to reduce the height of the loading process.


Related News

Related Products